ZG-31 Electric Rail Drilling Machine – 0.75kW, 31kg phurh theih, ±0.5mm dik tak a ni.
He page ah hian .
- Inhmelhriattirna
- Diesel-Powered drills-a hmun hrang hranga drills neih theih lohna .
- ZG-31 Electric Rail Drill hian a thatna pawimawh tak tak a pe a ni.
- A hman dan tlangpui .
- Technical lam thila thil chiang tak tak .
- Hnathawh dan tur kaihhruaina .
- Maintenance & Hriselna .
- Zawhna zawh fo thin .
- quote duh tan contact .
Product chungchang tlangpui .
ZG-31 hi portable a ni a .Electric rel hmanga lirthei khalh dan tur .Tunnel, khawpui, depot, leh workshop-a thawk, rel kawng enkawltu team leh contractor-te tan ruahman a ni. Engine thawm emaw exhaust emission emaw awm lovin a thawk a, boruak quality leh noise regulation khauh tak nei environment tan a tha hle.
Electric motor 0.75 kW hmanga siam niin ZG-31 hian 1000 atangin hole a drill a.Φ9.8 mm atanga Φ36 mm atanga second 30 hnuai lam a ni.a diameter tolerance chu ±0.5 mm a ni. A design lightweight 31 leh a quick-Clamp system hian one-person setup chu minute 2 hnuai lamah a enable a, chu chuan scheduled maintenance leh emergency rail repairs te pawh a support a ni.



ZG-31 Electric Rail Drill – Technical lam atanga thil siam chhuah te.
| Parameter 100 a ni. | Specification . |
| Motor chakna a pe thei bawk. | 0.75 kW a ni. |
| Voltage a awm thei . | 220V / 380V (phase pathum emaw pathum emaw) a ni. |
| Spindle speed 1000 a ni. | 200 rpm a ni. |
| Drill diameter 1000 a ni. | Φ9.8 mm – Φ36 mm a ni. |
| Hole khatah hun a awm . | Second 30 aia tlem emaw a aia tlem emaw . |
| hole dikna . | ±0.5 mm diameter, ±1 mm a awmna hmun a ni. |
| Machine rih zawng . | 31 kg (Portable design) a ni. |
| A zau zawng (L×W×H) a ni. | 695 × 230 × 395 mm a ni. |
A thatna pawimawh tak takte .
- ✅ Emission zero & ri hniam .– Electric operation hian exhaust meikhu a ti bo a, noise level a ti tlem a, tunnel leh khawpui rail zone-a himna mamawh phuhrukna a ni.
- ✅ drilling chak taka thawh theihna .– Hollow-core bits hmangin second 30 aia rei lo emaw a tlukpui emaw-ah standard Φ31 mm hole a drill a, manual emaw hydraulic alternative aiin a rang zawk hle.
- ✅ Positioning dikna sang tak .– ±0.5 mm hole diameter tolerance hian splice plate leh signal bracket-te tan bolt fit rintlak a siam a, chu chuan long-Term rail stress a ti tlem a ni.
- ✅ A rit lo & a phur thei bawk– Integrated handle neiin kg 31 chauh a rit a; Technician pakhatin a phur thei a, a enkawl thei bawk.
- ✅ Power supply pawh a inthlak danglam thei .– Standard 220V single-Phase emaw 380V pathum-Phase power sources rail depot leh construction site-a awm tlangpui nen a inmil.
Hnathawh dan tur kaihhruaina .
- Clamp setup a ni a .: Fixture chu rail-ah slide la, hand-Pressure pad-in rail head a contact kim vek thlengin hmalam screw chu tikhauh rawh.
- A san zawng siamthat .: Side bolts te chu phelh la, vertical adjustment screw chu rotate la, drilling point-a drill bit chu perpendicular-in align la, chutah chuan re-Tightten rawh.
- Coolant hman dan tur .: Spray bottle chu cutting fluid nen fill la, drilling laiin hnawih la, bit wear tihtlem leh hole finish tha zawk siam rawh.
- Power inzawmna .: Grounded 3-pin plug hmang rawh. Drill-apply steady downward pressure chu force la, motor chu a cut zawh tir rawh.
- Drilling & tihfai hna thawh tur a ni.: Motor chu start la, breakthrough thlengin zawi zawiin feed la, chutah chuan bit chu retract leh rawh. Metal swarf chu la chhuak nghal la, corrosion a awm loh nan.
> ⚠️ Hriselna atana hriat tur .: Drill bits i thlak hma emaw, maintenance i tih hmain power i disconnect hmasa thin tur a ni. Wet condition emaw explosive atmosphere emaw ah pawh hnathawh loh tur.
Maintenance & Hriselna .
- ✅ Hman hmain .: Power cord, switch, leh plug te chu a chhiat leh chhiat loh enfiah thin ang che. Insulation a crack emaw a chhe emaw a nih chuan thlak leh tur a ni.
- ✅ Carbon brush te pawh a awm .: enfiah fo thin; 5 mm hnuai lam (a tlangpuiin operating hour 500 hnuah) a inbel chuan thlak leh rawh.
- ✅ Drill bits .: Drilling hun a tam emaw, sparking tam lutuk emaw a awm chuan resharpen emaw thlak emaw a ni thei.
- ✅ Dahthatna: Machine hman zawhah tifai la, chemical chhe thei tak tak atanga hla takah hmun vawt, boruak luh theihna hmunah dah rawh.
- ✅ Power cord hman dan tur .: Machine chu cord hmangin la ngai suh. Oil, a lumna hmun leh a sir lam hrual hrual atanga hlaah dah rawh.
A hman dan tlangpui .
- 🔧 Routine Track enkawl dan tur .– Splice plate, insulated rail joint, leh scheduled work window-a signal bracket-te dahna tur khur laih.
- 🚨 Emergency Rail siamthatna tur .– Rail thlak danglam emaw post-Derailment track siamthatna atana hman thuai.
- 🏗️ Rel siam thar .– Rel segment te chu pre-assembly atan batch drilling large-scale track- project te an dahkhawm thin.
- 🏭 Workshop siam dan tur .– Pre-Rail section off-Site-a -Track installation-a tlan theihna tur.
Zawhna zawh fo thin .
- Q: ZG-31 hi curved rail-ah hman theih a ni em?
- A: A ni. Clamp system hian standard rail profile-ah curve radius tlem berah meter 50-a sang a dah thei a ni.
- Q: Warranty hun chhung chu eng nge ni?
- A: Motor leh gearbox tan thla 12 a ni. drill bit leh carbon brush ang chi consumables te hi a khuh lo.
- Q: Operator training a awm em?
- A: A ni. Video tutorial kan pe a, optional on-site training (fees apply) kan pe bawk.
- Q: 110V version ka order thei ang em?
- A: Quotation neih chhung hian custom voltage configuration te chu dil theih a ni.
- Q: Engtin nge machine hi an thawn chhuah?
- A: Tuipui emaw air freight hmanga thingpui no emaw, tracking neia thawn chhuah. Delivery hun hi ni 7–25 chhung a ni a, a thlenna tur hmun azirin a ni.
Tunah hian i quote hi la rawh .
👉 Dilna dil rawh Proforma Invoice|OEM customization zawt rawh|Local Agent Contact ah awm rawh .
📧 Email:elinachina@126.com
📞 WhatsApp:+86 15617710309
🌐 Website:www.qlrailwaymachine.com ah hian a awm a.
hot tags .: Rail Hole Drilling Machine, China Rail Hole Drilling Machine siamtute, Supplier te, Factory te pawh a awm bawk.
