Rail Track Lifting Cart 1000 a ni.

Rail Track Lifting Cart 1000 a ni.

Kimchang
YGL-5 Rail Track Lifting Cart hi tunlai rel hmanga enkawlna atana hman tur hmanraw tangkai tak a ni. Rel kawng a kal zel avangin track tools tha leh rintlak tak tak mamawhna a sang chho zel a ni. YGL-5 hian rail, concrete sleeper, leh switch point te chu labor tlem ber nen a chawi sang a, a phur a, hnathawh him leh rang tak a enkawl a ni. Railway maintenance team, engineering unit, leh repair section lian tak tak tan a tha hle a, he hand-operated cart hi real-world track environment-a hman tangkai theih turin siam a ni.
Bithliahna
Railway Track hmanga lirthei tlan lirthei te .
Share to
Inquiry thawn rawh .
Chat tunah hian .
Hrilhfiahna
Technical Parameters 1000 a ni.

YGL-5 Rail Track Lifting Cart .

 

Rail rit tak tak emaw, concrete sleeper emaw hmanga crew-te’n an beih nasat em em? Thil tih dan hlui tawh tak takte chu theihnghilh rawh. YGL-5 Rail Track Lifting Cart hian tunlai track environment mamawh tak takte tan khawvel solution tak tak a pe chhuak a ni. Railway pros te hian component rit zawk leh schedule tight zawk - traditional, manpower-heavy techniques te an hmachhawn nasa hle. He hmanrua hian balance a shift dan chu hetiang hi a ni:

1. Slash effort, output tihpun:A danglamna chu hre nghal rawh. Kan kut-Cranked gear system hian tough lifts chu awlsam takin a tackling a. Moving rails, concrete sleepers, emaw switch points te chu mak tak maiin enkawl theih a ni a, hnathawh chak zawk laiin i team-a physical toll chu nasa takin a tikehsawm a ni. less grunt work, track siam zawh tam zawk. Chu chu YGL-5 efficiency a ni.

 

2. Engineered Safety & Toughness inhnaih tak takna hmun:Live track bulah rintlak takin hna i thawk em? Ni chiah e. YGL-5 rail track lifting cart hian double-insulated components chu standard angin a dah tel a - afterthought a ni lo. Mahse ruggedness a pawimawh bawk. Lightweight construction tih hian fragile tihna a ni lo; Mainlines, tricky sidings, steep slopes, leh messy ditch line hrang hrangah te performance tha tak beisei ang che. Spur quiet tak emaw, mainline repair critical tak emaw i thawk a nih pawhin, stability a built in a ni.

 

3. Versatility Nitin i rinchhan theih:Gear 25-meter hmanga lak chhuah a ngai em? Rail joint lian lutuk emaw, switch point assembly complex tak emaw enkawl? He rail track lifting cart hi a insiamrem thei. Hna rang tak nei tur chuan solo pakhat hmang la, a nih loh leh YGL-5 unit tam tak chu harsatna lian zawk hmachhawn turin seamless takin link rawh – hmasawnna tikhawtlai lovin crew number tihtlem. Khawvel puma maintenance gang-te’n an go-to hardware anga an rin chhan a ni.

 

4. A awlsam zawngin hetiang hian dah rawh:YGL-5 rail track lifting cart tih awmzia chu tih tam zawk, rang zawk leh him zawk, taksa ruh (muscle strain) tlem zawk tihna a ni. Thil hmanrua chauh a ni lo; Nitin grind atana proven, durable gear mamawh rel lama mithiamte tan chuan hna fing zawk a ni. I track gang shift thara a danglamna chu en rawh.

 

Specifications & Component hrang hrang .

 

Product images 1.1.

1
2
3

 

Nihphung Hrilhfiahna
Drive chi hrang hrang . Manual, kut-Cranked .
Gear system hmanga siam a ni. pahnih-stage straight-Tooth cylindrical gear tihtlem
Insulation 100 a ni. Double-insulation hmanga zin chhuahna system .
A hmanna bulpui ber . Lifting rails, concrete sleeper, switch point te pawh a awm bawk.
Attachment te pawh a awm . Push rods, counterweight chain, cranks, rail clamps, pulley hook, sleeper hook chain, nut washers
Bearings & Gears te pawh a awm bawk. 6205, 6306 bearings; Z=18, Z=44 Gears 1000 a ni.
Cable a ni . Φ7.7mm, meter 25 a ni.
Travel wheels . Φ170mm wheels a awm a, a chet theihna tur a awm bawk.

 

Zawhna zawh fo thin .

 

Q: Engtin nge YGL-5 hi him takin ka operate ang?

A: Kut zawm rawh-Crank instruction. Suspended load hnuaiah ding ngai suh. Chain leh hook te chu a nghet em tih enfiah rawh. Rail rit tak tak emaw switch point emaw atan cart tam tak hmang rawh.

Q: YGL-5 hian eng nge a chawi theih ang?

A: YGL-5 hian standard leh heavy rail, concrete sleeper, leh switch point te chu a ti sang thei a, a tisang thei bawk. Track maintenance task hrang hrang atan a tha hle.

Q: Engtin nge cart hi ka enkawl ang?

A: Shift hmain gears, bearings, leh pulley axle te chu lubricate la. Bearings hi pre-lubricated a ni a, kum khat chhung a daih thei. Chain leh hook te enfiah fo thin ang che.

Q: YGL-5 cart tam tak hi hman dun theih a ni em?

A: Ni e, unit 2-3 vel chu heavy rail leh switch point te coordination-in an thawk thei. Spacing leh synchronized operation inang reng nei reng tur a ni.

 

Kan rawn biak theih reng e

 

Email:elinachina@126.com

WhatsApp:+8615617710309

Website:www.qlrailwaymachine.com ah hian a awm a.

 

 

hot tags .: Rail Track Lifting Cart, China Rail Track Lifting Cart siamtu, Supplier, Factory

Inquiry thawn rawh .
Kan rawn biak theih reng eIf if have any question .

A hnuaia phone, email emaw online form hmangin min rawn biak theih bawk. Kan specialist chuan rei lo teah a rawn biak leh ang che.

Tunah hian contact rawh!