Quick navigation .
- Products sawifiahna .
- Technical lam thila thil chiang tak tak .
- Key Features & Hlawkna .
- Step- by-Step hmanga kalpui dan tur kaihhruaina
- khawiah nge hman a nih .
- Enkawlna & enkawlna .
- Engvangin nge QL machinery hi kan thlan?
- FAQ & Support 1000 a ni.
- Kan rawn biak theih reng e
Products sawifiahna .
ChumiZG-31 II Electric Rail Drilling Machine hmanga siam a ni.chu rel sleepers leh rails --a precision drilling atan engineered a ni a, track siamna, enkawlna leh fastening system-a speed, accuracy, leh durability tluk loh a pe chhuak a ni. Field engineer leh rail contractor te tana ruahman a ni a, he portable rail drill hian industrial-grade performance leh ergonomic handling a fuh a, chu chuan .Sleepers tan drill tha ber a ni.khawpui chhunga transit atanga remote rail corridor thlenga boruak mamawh takah.
Drills pangngai ang lo takin ZG-31 II hian a 1000 a nei a.Quick-Clamp rel kawng khar dan tur ., Tui-cooled hollow carbide bits ., lehElectric overload laka invenna .- hole quality mumal tak, operator himna, leh downtime tlem ber a awm theih nan. Joint plate emaw, signal bracket emaw, sleeper anchor emaw i dah a nih pawhin, he machine hian labor time 60% in a tihtlem a, laser-guided positioning hmanga guesswork a ti bo bawk.
Technical lam thila thil chiang tak tak .
ZG-31 II Electric Rail Drilling Machine - A chhuahna tur hmun leh a hmanna tur hmun te.
| Parameter 100 a ni. | Hlutna | Notes 1.1. |
| Motor chakna a pe thei bawk. | 1.0 kW a ni. | High-Torque, duty chhunzawm zel . |
| voltage a ni a, a . | 220V (standard) a ni. | 380V duh chuan dil theih a ni |
| NO-Load speed . | 400 rpm aia tam emaw, a tlukpui emaw | Feed pressure pawh a inthlak theih bawk . |
| Drill diameter 1000 a ni. | Φ9.8mm – Φ31mm a ni. | Standard hollow bits nen pawh a inmil thei |
| Max rel rit zawng . | 75kg/m a ni. | A fit 43kg/m – 75kg/m global rails |
| Drilling hun hman dan . | Second 40 aia tlem emaw a aia tlem emaw . | 60kg/m rail ah chuan a vawt hle. |
| Machine rih zawng . | 23 kg a ni a. | Handle & Clamp a awm bawk. |
| A zau zawng (L×W×H) a ni. | 530×330×420 mm a ni. | Transport & dahna tur compact . |
| Cooling system 1000 a ni. | Tui-A inmil . | Heat a tihtlem a, bit life a ti rei bawk . |
| Hriselna atana hman tur thilte . | Overload venhimna, emergency stop . | CE-Design zawm tur a ni. |
Engvangin nge ZG-31 II hi Sleepers tan drill tha ber a nih.
1. A dik leh dik loh-Guided drilling system .
Integrated alignment guide leh laser marker te hian ±0.5mm accuracy - a tichiang a, sleeper anchor leh fishplate hole positioning atan a pawimawh hle. Misaligned bolt emaw rework emaw a awm tawh lo.
2. Rail rel hmanga tlan chak .
Patented quick-Clamp mechanism hian machine chu second 10 hnuai lam chhunga rel profile (43kg/m–75kg/m) eng pawhah a secure a - hmanrua a awm lo, bolt awm lo, delays awm lo.
3. Industrial-Grade hollow drill bit 1000 a awm a.
Carbide-Tipped, coolant-chu bits hman theih a ni a, hardened steel rails hmangin friction tlem nen a cut a. Standard HSS bits aiin 3x in a rei zawk.
4. A rit lo & field-Ready .
23kg chauh a nih chuan operator pakhatin awlsam takin a phur thei. Compact footprint hi service vehicle-ah a fit a, remote emaw elevated track section atan pawh a tha hle.
5. Safe & Smart hmanga hnathawh dan .
Built-In thermal overload venna, emergency stop button, leh anti-vibration handle te hian extended shift lai pawhin operator te himna a tichiang a ni.
- hman dan awlsam & him .
ZG-31 II hman hi a vawi khatna atana hmangtu tan pawh - intuitive a ni. A hun apiangah perfect holes atan heng step 6 te hi zawm rawh:
- Pre-Chhiar tur a ni.- Cable, motor leh bit te enfiah rawh. Thil chhia leh inbel loh enfiah.
- Surface prep .- Rail/sleeper chunglam tihfai. Rust, grease, emaw thil chhe emaw te chu paih chhuak rawh.
- Mount & Clamp .- Machine position, engage quick-Clamp chu nghet taka a lock thlengin.
- align a ni .- Target mark chungah drill center turin guide scale emaw laser emaw hmang rawh.
- Verh- Start Motor → A tul chuan coolant chu activate rawh → a tul chuan steady steady apply rawh.
- Retract & Store ah te .- Power Off → Clamp chu thlah → hmun vawt takah dah la → dah rawh.



Rail Industries hrang hranga hman dan tur .
ZG-31 II hi ram 20 chuangah rel thuneitute leh contractor-te chuan an ring tlat a ni:
- ✅ Mainline rel kawng enkawl dan tur .- Joint plate leh sleeper fastener siamna tur drilling bolt holes.
- ✅ Subway & Light Rail siam dan .- Signal bracket, cable conduit, leh turnout components te dah a ni.
- ✅ Bridge & tunnel project hrang hrang te .- Expansion joint leh anchoring system te chu hmun inkharkhip chhungah a secure thin.
- ✅ Emergency siamthat hna thawh a ni.- Rail thlak danglam emaw, sleeper chhiatna emaw avanga hmanhmawh taka hman.
- ✅ Industrial & mining rel kawng .- Heavy-Duty drilling chu abrasive emaw, corrosive emaw environment-ah a awm.
Date dam rei theihna tur maintenance tips .
Nitin:Machine chu phih fai la, bit sharpness check la, cables enfiah rawh.
Kar tin:Lubricate guide rails, test emergency stop, boruak thianghlim vents te chu a tha hle.
Thla tin:Motor brush enfiah la, insulation resistance enfiah la, anti-Rust oil chu clamp-ah dah rawh.
Dahthatna:A vawt, boruak luh theihna hmunah dah rawh. Dustproof sheet hmangin khuh rawh. Power chu tihtawp rawh.
Engvangin nge QL machinery hi kan thlan?
🏭 A siamtu direct a ni.- Middlemen an awm lo. Competitive pricing, delivery rang zawk.
🛡️ Kum 1 chhung full warranty a awm tawh.- hian motor, gearbox, leh structural components te a huam a ni.
🌍 Khawvel pum huap tanpuina .- Nigeria, Indonesia, Brazil, Egypt - Spare Parts & Training awm thei te chu - Local agents te an ni.
🔧 OEM/ODM ah hian kan lo lawm a che.- Voltage, color, logo, emaw add accessories (dust collector, laser guide, etc.) te chu a duh angin siam rawh.
📦 Export ready .- Thing crate packaging, fumigation-Certified, tuifinriat/air shipping kan buaipui.
Zawhna zawh fo thin .
Q: Hei hi thing emaw composite sleeper emaw ah ka hmang thei ang em?
A: Yes - a ni a, bits dik tak (a tel lo) a awm bawk. Clamp system hian sleeper surface-ah optional adapter plate hmangin a insiamrem thei a ni.
Q: Unit pakhat tan eng nge lead time?
A: Deposit hnu ni 5–7 chhunga hnathawh. Unit 15+ chu urgent order turin stock-ah kan dah a.
Q: Training i pe em?
A: A ni - video manual, live zoom demos, leh on-site training (travel fees a awm).
Q: Sample ka la thei ang em?
A: A dik tak zet. Testing atana sample unit awm - refundable deposit hman a ni.
Vawiin hian i ZG-31 II dawng rawh - Quote & Demo a thlawnin!
📧 Email:elinachina@126.com
📞 WhatsApp:+86 15617710309
🌐 Website:www.qlrailwaymachine.com ah hian a awm a.
© 2025 QL Railway Machinery Co., Ltd. - Sleepers tana drill tha ber siamtu|ZG-31 II Electric Rail Drilling Machine hmanga siam a ni. Thuneihna zawng zawng a nei.www.qlrailwaymachine.com ah hian a awm a.
hot tags .: Sleepers tan drill tha ber, China Sleepers siamtute tan drill tha ber, supplier, factory
